Are you planning to counteract the rapidly rising energy prices and reduce your company's costs in the long term?
PV-Funding
Are you planning to counteract the rapidly rising energy prices and reduce your company's costs in the long term?
EIC Accelerator Plug-In
Companies now have improved chances to reach a new level with the EIC Accelerator Plug-In. This booster program increases the chance to get the EIC Accelerator!
EIC Accelerator Plug-In
Companies now have improved chances to reach a new level with the EIC Accelerator Plug-In. This booster program increases the chance to get the EIC Accelerator!
Leer
leer
News / Environmental Funding Environmental Funding

PV funding

Post from 28. July 2022

Are you planning to counteract the rapidly rising energy prices and reduce your company’s costs in the long term?
Apply NOW with us for photovoltaic & electricity storage funding if your project is to be implemented by the end of 2023!

The subsidy “EAG-Investment Subsidies” allows you to receive investment subsidies if you build or expand a new PV system and at the same time create an electricity storage system. Here, the amount of the subsidies is calculated by a specific subsidy rate. The decisive factors for the amount of the subsidy are in the case of
PV systems the peak output in kWp and for electricity storage the capacity in kWh, i.e. €/kWp and €/kWh.

This promotion is applicable for

  • new PV plants and extensions for the first 1,000 kWp
  • new electricity storage up to 50 kWh and at least 0.5 kWh/kWp
  • legal entities and natural persons
  • Projects for which, at the time of application
    • the start of the work has not yet been started
    • all permits/notifications required for the constructional emergence

and the point of delivery are available.

This funding program is divided into four categories. The decisive factor for these categories is the peak power of the photovoltaic system.
The 4 categories and their maximum subsidy rates are:

  • Category A: 0.01 to 10 kWp and 285 €/kWp
  • Category B: 10 to 20 kWp and 250 €/kWp (maximum)
  • Category C: 20 to 100 kWp and 180 €/kWp (maximum)
  • Category D: 100 to 1.000 kWp and 170 €/kWp (maximum)

The subsidy rate for electricity storage is set at €200/kWh. However, this subsidy is only possible up to a maximum capacity of 50 kWh. Funding for electricity storage is only possible in combination with a PV system, but not as a stand-alone measure.

Currently, the funding volume for categories B, C and D is 10 million euros each. An increase of these funding pots as in the 1st Call 2022 is possible but not yet confirmed by the official side.

In calendar year 2022, two more funding calls will take place for this investment grant for photovoltaics and electricity storage in categories B, C and D.

  • Call 23.08.2022 – 04.10.2022
  • Call 18.10.2022 – 29.11.2022

The applications can be submitted to these funding calls. After the start of the ticket draw, it is possible to complete the submission of the application from the following day. For this completion of the application a time limit of one week is set.

Our experience from the first call makes us the ideal partner to apply for this funding. Benefit from our expertise and make your personal consultation appointment with our expert now,
Lukas Kager +43 664 964 35 74 or Lukas.Kager@inspiralia.com

“Reducing energy costs while sustainably protecting the environment – what could make more sense?” Lukas Kager

Our experts for environmental projects

Lukas Kager

SENIOR TECHNICAL CONSULTANT
Lukas Kager joined our team in Vienna in June 2021. He is responsible for the processing of environmental grants.